Beijing to Shijiazhuang Passenger Dedicated Line
作者: 时间: 2016-12-12 点击率: 237

Beijing to Shijiazhuang Passenger Dedicated Line - geotechnical engineering survey, engineering survey
Beijing-Guangzhou part of the fast passenger corridor, line length of 278km.

 

Share: