Beijing Fangshan South Road
作者: 时间: 2016-12-15 点击率: 353

Beijing Fangshan South Road

- geological hazard assessment, geotechnical investigation, engineering survey

The project is about 12 kilometers long. The landforms are complicated, the natural environment is harsh, the mountain is steep, the valley is developed and the mountain erosion is strong. It crosses two groups of faults and folds.

 

Share: