Jingcheng Expressway Phase III Project
- Geotechnical investigation, engineering surveying, foundations detection
The total length of 63.994km, Hebei Province is the first true meaning of the mountain expressway, a total of eight interchange along the bridge, 108, 20 tunnels.
Share: