Beijing subway, complex eight line - geotechnical engineering survey, engineering survey
For the Beijing subway line east extension project, was founded in 1989, nine underground stations, two on the ground, a total length of 13.5 kilometers, is an underground traffic artery running through the Chang'an Avenue.
Share: